
Recently we performed an MLS survey for Bowen Rail Company covering approximately 210 kilometres of railway line from Kangaroo to the mine at Belyando. The images show some mobilisation activities as well as on track capture. Conducted before a major network shutdown, this survey minimised operational impacts despite some inclement weather and was performed within tight timeframes.
Relying on our own in-house designed and built MLS system, the survey builds upon an initial MLS survey from February 2024 and demonstrates the commitment by the Bowen Rail Company to leverage data and technology for efficient and safe rail operations and maintenance. Our thanks go to the talented Bowen Rail team that helped make the survey possible.