Our Work
V/Line Asset Inventory Update
Agonics delivers comprehensive asset inventory across V/Line network
Client
V/Line
Location
Regional Victoria
Challenge
V/Line needed to establish a comprehensive digital inventory of its assets across the Victorian regional passenger and freight network within a strict timeframe. With a total track length of 3,300 km, this required rapid data acquisition across two different rail gauges.
Solution
Working collaboratively, V/line and Agonics mobilised and recorded MLS data on a V/Line P-Class locomotive and on two hyrail vehicles. The MLS datasets were post processed to produce 3D spherical images with real-world coordinates.
A digital asset inventory was then extracted in accordance with an agreed data specification. Matching reports to existing JD Edwards asset information were prepared as well as project accuracy statements..
Outcomes
- The approach ensured that tight recording schedules were met through rapid MLS system deployments.
- The project delivered a high volume of asset features to V/Line.
- Deliverables included an asset geodatabase, track centrelines, a digital elevation model, and survey accuracy reports.
- Corridor imagery and LiDAR datasets are accessed by V/Line employees using the Agonics XERRA® platform.
Download Full Case Study here
"*" indicates required fields
Related Projects
ARTC / Vertex Rail Virtual Signage
XERRA® Supports virtual placement of new signage across Nullarbor tracks.
View
Martinus Inland Rail
Complex clearance assessments on new and existing tracks on the Inland Rail Albury-Parkes corridor.
View
ARTC Data Refresh
Agonics delivers updated LiDAR and imagery across 2,000km of track in NSW and Victoria and including new Hunter Valley datasets.
View