MTM – XT2 Rollingstock Integration

MTM – XT2 Rollingstock Integration

Challenge Metro Trains Melbourne (MTM) and the Victorian Department of Transport planned to introduce a new passenger train onto the Melbourne electrified network. Differences in the driver cabin design and carriage door configuration required signal sighting and...
ARTC – Vertex Rail Virtual Signage

ARTC – Vertex Rail Virtual Signage

Challenge ARTC consultant, Vertex, needed to install 440 new trackside signs across remote Nullarbor tracks. Their placement needed to meet specific site requirements but also ensure minimum sighting distances for approaching trains. Solution Having previously...
Martinus Inland Rail

Martinus Inland Rail

Challenge Inland Rail will improve freight capacity between Melbourne and Brisbane by upgrading track for double stacked container movements. As the project is on an operational corridor, Martinus needed to demonstrate construction completion and clearance compliance...
ARTC Data Refresh

ARTC Data Refresh

Challenge MLS datasets collected by Agonics in 2019-21 had become outdated due to network changes. To help ARTC maintain its Ellipse asset base and ESRI GIS fresh datasets were needed as well as new MLS datasets on the Hunter Valley network that had not been...
KiwiRail Network Survey

KiwiRail Network Survey

Challenge To support the operation of a new Track Evaluation Car or TEC, a complete, spatially accurate Tracks Database was needed to align the multiple instrument outputs that the TEC would generate. Solution Agonics mobilised its MLS system onto a hyrail vehicle to...